Locations / Jacksonville / Pricing
CR3 American Exteriors · Jacksonville
Jacksonville exterior
Pricing guide
Clear planning ranges for homeowners in Jacksonville and surrounding communities—before you schedule an inspection.
How to read
these ranges
We start from the same CR3 baseline everywhere and adjust it for regional costs using public data. Use these ranges to plan. They are not a quote or a final price.
20-square roof
approximately 2,000 sq. ft.
Standard asphalt shingles
$10,500–$13,000Premium asphalt shingles
$11,500–$14,000Standing-seam metal
$31,000–$36,000Concrete or clay tile roof
Florida-appropriate option$30,000–$35,000
20-square siding project
approximately 2,000 sq. ft.
Vinyl siding
$18,500–$20,500James Hardie or LP SmartSide
$30,000–$33,000Hardie or LP with complete window trim
$38,000–$41,000
Installed per unit
standard opening; no interior work
Double-hung window
$925–$1,025Bay window
$4,100–$5,200Impact-rated window
Florida-appropriate option$1,200–$1,600
What the range assumes
What may change
the final price?
- 01
Roof pitch, height and difficult access
- 02
Multiple elevations, cut-up areas and architectural complexity
- 03
Tear-off layers, disposal and concealed damage
- 04
Product line, color, accessories and warranty selection
- 05
Code, permit, wind-load and site-specific requirements
- 06
Interior finish work or structural correction not included above
Local cost factors
What moves the price in Northeast Florida
Florida’s building code sets wind requirements that shape roofing costs: how the deck is fastened, the underlayment used and how shingles or tile are attached. Permits and inspections are part of the job.
Near the coast, corrosion-resistant metals add cost. For windows and doors, impact-rated products cost more than standard ones, and whether you need them depends on where the home is and what protection it already has.
For an exact price, start with a free inspection
Pricing last reviewed October 2026. Ranges are rounded for planning and are not a CR3 proposal. We write your proposal after we measure, check the conditions and confirm the scope, products and local code requirements.