Locations / Wilmington / Pricing

CR3 American Exteriors · Wilmington

Wilmington exterior
Pricing guide

Clear planning ranges for homeowners in Wilmington and surrounding communities—before you schedule an inspection.

How to read
these ranges

We start from the same CR3 baseline everywhere and adjust it for regional costs using public data. Use these ranges to plan. They are not a quote or a final price.

20-square roof

approximately 2,000 sq. ft.

  1. Standard asphalt shingles

    $10,500–$13,000
  2. Premium asphalt shingles

    $11,500–$14,000
  3. Standing-seam metal

    $31,500–$37,000

20-square siding project

approximately 2,000 sq. ft.

  1. Vinyl siding

    $19,000–$21,000
  2. James Hardie or LP SmartSide

    $30,500–$33,500
  3. Hardie or LP with complete window trim

    $39,000–$42,000

Installed per unit

standard opening; no interior work

  1. Double-hung window

    $950–$1,100
  2. Bay window

    $4,200–$5,300

What the range assumes

What may change
the final price?

  1. Roof pitch, height and difficult access

  2. Multiple elevations, cut-up areas and architectural complexity

  3. Tear-off layers, disposal and concealed damage

  4. Product line, color, accessories and warranty selection

  5. Code, permit, wind-load and site-specific requirements

  6. Interior finish work or structural correction not included above

Local cost factors

What moves the price in the Wilmington area

Coastal wind requirements shape roofing here: how shingles or metal panels are fastened, the underlayment used and corrosion-resistant flashing all affect cost. Metal roofing is a popular choice near the coast and costs more up front than shingles.

For siding, fiber cement and vinyl price very differently, and beach properties add access and scheduling factors. Impact-rated windows are a common upgrade.

For an exact price, start with a free inspection

Pricing last reviewed October 2026. Ranges are rounded for planning and are not a CR3 proposal. We write your proposal after we measure, check the conditions and confirm the scope, products and local code requirements.

Scroll To Top